FactoryVision

BOMs, Work Orders, and Tracking Without a Full ERP: Practical Workflows for Discrete Plants

On this page
  1. How to organize production records without an ERP
  2. How to manage a bill of materials without an ERP
  3. How to manage work orders without an ERP
  4. How to track work-order progress without an ERP
  5. Review progress at shift handover
  6. Know the system boundaries
  7. Sources and claims
  8. Frequently asked questions
  9. Start with an introductory call

How to organize production records without an ERP

Assign identifiers and define how updates reach the shop floor.Structured registers, work orders, shop-floor travelers, and station counts support production records without a full ERP.1Record productsBOM and revision2Create work orderProduct and route3Use travelerFollow the batch4Track progressStation part count
Assign identifiers and define how updates reach the shop floor.

A production team needs to know what to make, which materials to use, where work goes next, and how much has been completed. A spreadsheet or structured register can hold that information without a full ERP.

Give each product and work order a distinct identifier. Decide who maintains the records, where the approved version lives, and how changes reach the shop floor. The aim is to make the plan and the latest production record easy to find.

How to manage a bill of materials without an ERP

A bill of materials (BOM) lists the components and raw materials required to make a product. For a simple BOM register, record:

  • The finished-product or parent-assembly identifier.
  • Each immediate component’s identifier and description.
  • The quantity and unit of measure required.
  • The approved revision and its effective date.
  • Any applicable scrap allowance used for material planning.

Give separately produced subassemblies their own identifiers and link them to the parent product. Record common hardware, such as fasteners and hinges, consistently so requirements can be combined across products.

Use the approved BOM to prepare picking lists. When a revision changes, review affected work orders and make sure the floor has the correct instructions.

How to manage work orders without an ERP

A work order tells the team what to produce and where the work should go. A printed traveler can accompany a batch through its stations.

Include the work-order number, product identifier, applicable drawing or BOM revision, required quantity, routing sequence, and target completion date. Set station targets for the work being performed, and choose batch sizes and work-in-progress limits that suit the process.

Operators can record quality deviations and material shortages on the traveler. Assign someone to review those notes and coordinate the response. When a route or order changes, update the traveler and the corresponding production record.

How to track work-order progress without an ERP

Keep product structure and shop-floor progress linked.A BOM lists materials and components; a traveler carries work-order and routing information through stations.BOMTravelerComponents✓—Revision✓✓Routing—✓Station progress—✓
Keep product structure and shop-floor progress linked.

Travelers communicate what needs to be made. FactoryVision counts finished parts, shows progress against the station’s daily target, and tracks downtime.

Decide how the team will associate each station’s count with the active work order, including what happens when a station changes jobs. Review the count alongside the traveler and any quality or rework records; a station count alone does not establish that goods are ready to ship.

For counting, the camera needs a clear view of countable, discrete parts. Check the proposed view for overlapping or stacked parts and motion blur. Shiny or transparent parts require lighting work. Continuous streams, such as extrusion, are outside the product’s scope.

FactoryVision’s models run on a small computer in the factory. Teaching a cycle uses ten parts. The station light shows progress against the day’s target: green means on track, yellow means at risk, and red means behind.

Review progress at shift handover

At handover, record the active work order, the quantity completed, the remaining target, and any material or quality issue the next shift needs to address. Record downtime and its cause in the factory’s chosen categories.

Separate finished-part counts from rejected parts, rework, and quality approval. This gives the next team a clearer view of what has been produced and what remains to be done.

Know the system boundaries

FactoryVision runs in a Turkish door and furniture factory. It counts finished parts and tracks downtime for visible, countable discrete parts.

FactoryVision is not an ERP, MES, or SCADA system. The BOM, stock, work-order instructions, quality decisions, and shipping records in this workflow remain part of the factory’s own processes.

Sources and claims

ClaimSource
FactoryVision runs in a Turkish door and furniture factory; buying starts with an introductory call tailored to the company’s machines and processes.
FactoryVision counts finished parts with a camera at each machine; teaching a cycle uses ten parts.`content/articles/count-finished-work-with-one-camera.json`
FactoryVision compares output with the daily target and displays station status: green means on track, yellow means at risk, and red means behind.`content/articles/count-finished-work-with-one-camera.json`
FactoryVision tracks downtime.
No wiring into the machine is required; models run on a small computer in the factory.`content/articles/count-finished-work-with-one-camera.json`
The fit is visible, countable discrete parts; shiny or transparent parts require lighting work; extrusion is outside scope.`content/articles/count-finished-work-with-one-camera.json`
FactoryVision is not an ERP, MES, or SCADA system.`content/articles/count-finished-work-with-one-camera.json`
The topic reflects questions about BOMs, work orders, and tracking outside a full ERP.`docs/seo/research-2026-11-12/evidence-fv-demand-2026-11-15.md`
Introductory-call booking link.

Frequently asked questions

Can a factory maintain BOMs without an ERP?

Yes. A structured spreadsheet or register can list each product’s components, quantities, units, and approved revision. Assign an owner to maintain it and make the approved version available to the people who need it.

Can a factory track work-order progress without a terminal at every machine?

A factory can use physical travelers alongside station-level counting. Define how the team associates counts with the active work order and records job changes, quality decisions, and rework.

Does FactoryVision require a connection to the machine’s PLC?

No. FactoryVision requires no wiring into the machine.

Does a finished-part count mean an order is ready to ship?

No. Review the count against the work order and the factory’s quality, packaging, and shipping records before treating goods as ready for shipment.

What happens after the introductory call?

We get to know the company, its machines, and its processes so the setup fits how the factory works. Teaching a cycle uses ten parts.

Start with an introductory call

Buying starts with an introductory call. After the call, we get to know your company and its machines and processes so the setup fits how you work. Book an introductory call.

Request an intro call