FactoryVision

What Is Dark Grey Downtime and How Do You Investigate Unnamed Stops?

On this page
  1. Where Should You Look for Unnamed Machine Stops?
  2. Can Production Counts Explain Downtime?
  3. Use downtime records to guide action
  4. Track production without wiring into the machine
  5. Sources and claims
  6. Frequently asked questions
  7. Getting started: the introductory call

Where Should You Look for Unnamed Machine Stops?

Use both records to investigate unnamed interruptions.A shift total shows completed parts; a stop record shows when an interruption happened and whether it has a reason.Shift totalStop record• Completed parts• No stop detail• Start and end• Cause or unknown
Use both records to investigate unnamed interruptions.

The demand synthesis uses the phrase for uncategorized intervals on production timelines. Reduced operating speed is a related loss, but it should be examined separately from stopped time.

FactoryVision counts visible finished parts and tracks downtime without wiring into the machine. It gives production teams information to review alongside what they see on the factory floor.

Unnamed stops can occur anywhere a machine, station or line waits before production resumes. Examples to investigate include:

  • A short interruption cleared by an operator without a maintenance ticket.
  • A feed interruption caused by a misaligned blank or jam.
  • A downstream station waiting for material from an upstream process.
  • An adjustment during changeover that takes longer than planned.

These are investigation starting points, not conclusions. A recorded interruption does not establish its cause.

Can Production Counts Explain Downtime?

A shift total shows how many parts were completed. On its own, it does not show whether a shortfall came from stops, material flow or reduced operating speed.

When reviewing shift records, check:

  • Which machine or station stopped?
  • When did the interruption start and end?
  • Was a reason recorded? If so, is it specific enough to investigate?
  • Did the same kind of interruption occur in other shifts?
  • What was happening with material supply and the production schedule at the time?

Record the reason as unknown when it has not been established. Update the record after the team investigates.

Use downtime records to guide action

Keep an unverified cause marked as unknown.Investigate an unnamed stop by locating the station, checking time and cause, comparing shifts, and assigning review.1Locate stopMachine and station2Check the timeStart and end3Review the causeUnknown if unproven4Assign reviewCompare other shifts
Keep an unverified cause marked as unknown.

Review interruptions alongside finished-part counts, maintenance notes and observations from the floor. Group recurring stops in language operators and supervisors recognize, then assign an owner to investigate them.

Compare the record with machine condition, material supply and staging arrangements. A dashboard can show information; the team still needs to investigate the interruption and act on the finding.

When using OEE, check how your calculation classifies short stops and reduced speed before interpreting the result.

Track production without wiring into the machine

FactoryVision counts finished parts using a camera at the machine and tracks downtime. The models run on a small computer in the factory. The system does not require wiring into the machine.

The fit is countable, discrete parts that are visible to the camera, including parts used in door, furniture and metal production. Continuous processes such as extrusion are outside this scope.

FactoryVision is not an ERP, MES or SCADA system. It counts finished parts and tracks downtime. Teams can review that information alongside their existing production and maintenance records.

Sources and claims

SourceSupported information
`docs/seo/research-2026-11-12/evidence-fv-demand-2026-11-15.md`Demand synthesis uses “dark grey” for uncategorized downtime intervals and identifies reduced speed as a related production loss.
FactoryVision counts finished parts and tracks downtime; its scope is countable discrete parts; it is not an ERP, MES or SCADA system; it runs in a Turkish door and furniture factory; buying starts with the linked introductory call.
Supplied house-style sampleCamera-based counting, no machine wiring, local model processing, examples of suitable discrete parts, and exclusion of continuous extrusion.

The questions, examples and review steps in this guide are operational guidance. They are not claims about customer results or automated root-cause identification.

Frequently asked questions

What is dark grey downtime?

In this guide, it means a recorded production stop without an assigned reason. The term describes a gap in the record; it does not identify the cause.

Is reduced speed the same as downtime?

No. Reduced speed and stopped time are different production losses. Review how each is classified in your records and OEE calculation.

Does a downtime record identify the cause of a stop?

A record provides a starting point. The team needs to investigate the interruption before confirming its cause.

How does FactoryVision track production without wiring into the machine?

FactoryVision uses a camera to count visible finished parts and tracks downtime. Its models run on a small computer in the factory.

Can FactoryVision replace an ERP, MES or SCADA system?

FactoryVision is not an ERP, MES or SCADA system. Its scope is finished-part counting and downtime tracking.

Where is FactoryVision in use?

FactoryVision runs in a Turkish door and furniture factory.

Getting started: the introductory call

Buying starts with an introductory call. After the call, we get to know your company so the setup fits your machines and processes. Book an introductory call with FactoryVision

Request an intro call